Secretary Salazar Announces $13 Million Contract for Navajo Indian Irrigation Project Pumping Plants

08/26/2009
Last edited 09/29/2021

WASHINGTON, D.C. – Secretary of the Interior Ken Salazar announced today that the Bureau of Reclamation has awarded Archer Western Contractors, Ltd. of Phoenix, Arizona, a $13 million contract to construct two pumping plants near Farmington, New Mexico. The pumping plants are key features for continued development of the Navajo Indian Irrigation Project. That ongoing project, which Reclamation is developing for the Bureau of Indian Affairs, provides water for the Navajo Agricultural Products Industry farming enterprise of the Navajo Nation.

“This award helps fulfill one of the major goals of both President Obama and the Interior Department in working with Indian Country – advancing the self-sustaining economic development of Indian communities,” said Salazar, who met with Navajo Nation President Joe Shirley and other Navajo officials last week in Window Rock. “The Navajo Nation Irrigation Project benefits the economy of the Four Corners area and especially the Navajo Nation not only through farm employment, but also through numerous multiplier benefits to local, regional, and national economies as crops are grown, harvested and marketed primarily by Navajo workers.”

The Navajo Nation Irrigation Project, which was begun in 1964, is now 70 percent complete. Under the new contract, the Phoenix firm will construct the pumping plants over the next two year period. The contract covers complete construction of the pumping facilities including buildings, electrical work, installation of electronic operating controls, and installation of the pumps. The associated pipe laterals that will carry the water will be constructed through a future contract. The pumping plants are located about 14 miles south of Farmington, New Mexico and are scheduled to be completed in the fall of 2011.

“When these pumping plants and pipe laterals are completed, an additional 5,166 acres of irrigation capacity will be added to the Navajo Indian Irrigation Project,” Reclamation Commissioner Michael Connor announced. Reclamation is responsible for design and construction of the irrigation facilities to the point of the individual farm units. The BIA, in cooperation with the Navajo Nation, is then responsible for developing the farm units.

The pumping plants are part of Block 9 of the Navajo Indian Irrigation Project. Blocks 1 through 8, and Block 9, Stage 1are done and have a combined irrigation capacity of 77,685 acres. The total authorized project is for 11 blocks, totaling slightly over 110,000 acres of lands.

  • Press Release
    08/21/2026

    Interior Department Finalizes Plans for 2027-2028 Colorado River Operations

    The Department of the Interior issued the 2027-2028 Operating Guidelines and the Record of Decision for the Post-2026 Colorado River Operations Final EIS, establishing a 10-year Decision Framework with a broad operational range that will be used to develop future operational guidelines for Lake Powell and Lake Mead.

    Read more
  • Press Release
    07/31/2026

    Reclamation Publishes Final Environmental Impact Statement for Future Colorado River Operations

    The Bureau of Reclamation has released the Final Environmental Impact Statement, which designates a preferred course of action for future management of Lake Powell and Lake Mead. The preferred alternative establishes an adaptive decision framework to be used to develop operating guidelines designed to ensure reliable operations in the Colorado River Basin while maintaining the flexibility to respond to changing conditions over a 10-year period through 2036. The framework also preserves the opportunity for the Basin to continue working towards consensus agreements, and if successful, be incorporated into future operations.

    Read more

Was this page helpful?

Please provide a comment